Thermal insulation of the steam pipelines and the drum of the steam boiler
From November 2012 to January 2013 the company employees worked on the thermal insulation of steam lines and the steam boiler drum corps.
Thermal insulation of electric filter framework
From November 2012 till March 2013 the installation department of "Inventum Ukraina" company has performed works of thermal insulation of electric filter framework.
Insulation of equipment and pipelines of recovery boiler
 In January 2013 specialists of our company performed the works on thermal insulation of equipment and pipelines of the recovery boiler.
Thermal insulation of electric filter framework
From August 2012 till January 2013, "Inventum Ukraina" company has performed works of thermal insulation of electric filter framework.    
Thermal insulation of pipelines of the engine room power block
During December 2012 specialists of “Inventum Ukraina" company carried out the works on thermal insulation of pipelines using mats (blankets) based on ceramic fiber.
Lining of the furnace cell of steam-boiler
In December 2012, employees of  “Inventum Ukraine” company completed the works on the lining of the steam boiler.    
Works on the steam boiler walling
In November 2012 the mounting department of our company performed works on the steam boiler walling
Works on replacement of the furnace lining reforming ammonia
From October till November, 2012 the "Inventum Ukraine" company carried out the works of replacement of the furnace lining reforming ammonia.  
Installation of thermal insulation of electric filter framework
From August till October 2012 the specialists of our company carried out the installation of thermal insulation of electric filter framework.
Works on the steam boiler walling
Specialists of the "Inventum Ukraine" company in October, 2012 performed works on a brickwork envelope and heat insulation of the furnace camera of the heatunit.