Task:
• installation of blocks of two single-stage furnaces with a thermal capacity of 6.5 MW each (total weight 220.0 t).
 
Realization:
• installation of two water pipe heat exchangers;
• installation of metal structures of furnace units with dry ash removal;
• installation of two flue heat exchangers (water heaters);
• installation of metal structures of the chimney frame;
• installation of a chimney pipe;
• installation of two economizers;
• installation of metal structures of two multicyclones;
• installation of two filter units (sleeve filters);
• installation of metal constructions of stairs, platforms and gas pipes;
• installation of metal structures and fuel storage hydraulics with conveyors to furnaces and fuel supply devices;
• installation of two sets of auxiliary furnace equipment (smoke extractor, fans, ash containers, airlocks, feed and discharge screws, hydroelectric power stations);
• installation of support structures, pipelines, equipment and components of two furnaces;
• installation of lining and thermal insulation of two single-stage furnaces.
 
Result:
• the entire scope of work was performed professionally, in full and within the stipulated time.

Other projects

Customers

logo
logo
logo
logo
logo
logo
logo
logo
logo
logo
logo
logo
logo
logo
logo
logo
logo
logo