Year: 2019
Country: Ukraine
Industry: Chemical and petrochemical industry
Task:
to perform the repair in a short time frame (within 14 days).
Implementation:
• dismantling of the old lining;
• delivery of materials;
• installation of a new lining (heat-insulating layer, which is blankets made of ceramic fiber and a refractory layer, fire-brick laying with a volume of 19 cubic meters);
• replacement of 28 burner block sets.
Result:
competently performed work in full and on time.
Other projects