Year: 2020
Country: Ukraine
Industry: Energy
The works included:
• the repair of the steam distribution and control system;
• the repair and partial replacement of rotor blades;
• the repair and partial replacement of valves and ejectors;
• the repair of diaphragm cages;
• the repair and replacement of rotor shaft seals;
• the repair of the oil system and condenser;
• the repair of rotary diaphragms;
• replacement of thermal insulation, etc.
Result:
the work was carried out competently and in a very short time frame.
Other projects